Giving Elevators a Lift

By clicking "Register", you acknowledge that you have read BNP Media’s Privacy Policy, agree to its terms, and consent to allow BNP Media to use your information consistent with the Privacy Policy. You agree your information submitted will be shared with the sponsor(s) of the webinar. To read our Privacy Policy, please click here
Webinar On-Demand
Sponsored by Inpro
Presented by Tom Roller

Learning Objectives:

  1. Explore the factors driving the need for elevator cab interior renovation.
  2. Examine the various codes and standards impacting a cab renovation project.
  3. Identify the material and design options for cab walls, trims, hardware, ceilings and lighting.
  4. Assess the key installation considerations to reduce elevator downtime.

Credits:

AIA
1 AIA LU/Elective
ICC
0.1 ICC CEU
IACET
0.1 IACET CEU*
AIBD
1 AIBD P-CE
AAA
AAA 1 Structured Learning Hour
AANB
This course can be self-reported to the AANB, as per their CE Guidelines
AAPEI
AAPEI 1 Structured Learning Hour
MAA
MAA 1 Structured Learning Hour
NLAA
This course can be self-reported to the NLAA.
NSAA
This course can be self-reported to the NSAA
NWTAA
NWTAA 1 Structured Learning Hour
OAA
OAA 1 Learning Hour
SAA
SAA 1 Hour of Core Learning
 
This course can be self-reported to the AIBC, as per their CE Guidelines.
As an IACET Accredited Provider, BNP Media offers IACET CEUs for its learning events that comply with the ANSI/IACET Continuing Education and Training Standard.
This course is approved as a Structured Course
This course can be self-reported to the AANB, as per their CE Guidelines
Approved for structured learning
Approved for Core Learning
This course can be self-reported to the NLAA
Course may qualify for Learning Hours with NWTAA
Course eligible for OAA Learning Hours
This course is approved as a core course
This course can be self-reported for Learning Units to the Architectural Institute of British Columbia
This test is no longer available for credit

When one considers a major building renovation, it’s easy to focus on spaces like corridors, lobbies, offices, guest or patient rooms . . . in other words, all the public-facing spaces. We would argue that right after the lobby, a building’s elevators are the very next public-facing space building occupants and visitors see. This course lays out the case for cab renovations as a part of an overall building interior update.

cover

Photo courtesy of Inpro Corporation


TomR

 Tom Roller, is a 20-year veteran at Inpro. He started literally at the ground floor in Shipping and Receiving, through inside and outside sales positions, and is now in Regional Sales Management for the Elevator Interiors division. He is currently enrolled in the NAEC Vertical Transportation Management certification program.

 

Inpro Corporation Founded in 1979, Inpro® is a global provider of high-performance, design-forward architectural products for building professionals.

Inpro's product categories include door + wall protection, washroom systems, expansion joint systems, cubicle curtain + privacy systems, elevator interiors, architectural signage, and commercial window treatments.

 

Originally published in August 2023

Notice

Academies