Sponsored by GCP and Clopay | Presented by Mary C. Arntzen, P.E. and Luke A. Niezelski, P.E
Webinar On-Demand
Air barriers are naturally difficult to repair due to their integration within the wall assembly and the care required to design and build exterior walls that control air, water, water vapor, and heat. To avoid expensive and time-consuming repairs, project teams need to pay special attention to air barrier design decisions at the front end of a project. The alternative can be costly—an overclad project to control air movement in an exterior wall assembly for just a two-story office building can be in the hundreds of thousands of dollars. In this webinar, we will review code requirements and air barrier options for enclosure projects, share observed trends in the industry, and highlight common mistakes in designing and constructing air barrier systems. We will also share recommended approaches for designing and testing air barrier products and systems to help stakeholders avoid problems with air infiltration once the building is in service.
Photo courtesy of Simpson Gumpertz & Heger Inc.
![]() |
Mary C. Arntzen, P.E., is a Senior Project Manager with Simpson Gumpertz & Heger and has experience in designing, investigating, and rehabilitating building enclosure systems and frequently provides construction-phase services. She serves as a project manager for various large and complex projects, often working directly with owners, architects, construction managers, and developer clients, as well as subcontractors, manufacturers, and other consultants. Her experience also includes reviewing glass-and-metal curtain wall systems, windows, roofing, plaza waterproofing, cladding, and below-grade waterproofing systems. |
![]() |
Luke A. Niezelski, P.E, is a Senior Consulting Engineer with Simpson Gumpertz & Heger’s building technology group. He is experienced in investigating, assessing, and designing historic and contemporary building enclosures. He also provides construction administration, monitoring/inspection, and field-testing services. Luke has been involved in various Boston high-rise construction projects and is routinely collaborating with architects, owners, and contractors on complex building enclosure designs. |