Optimizing Snow-Melting Systems  

Specifying system types, components, and controls to meet project-specific performance

Sponsored by WATTS Water Technologies, Inc. | By Peter J. Arsenault, FAIA, NCARB, LEED AP

Typical Design Criteria for Snow-Melting Systems

With all of the site conditions, design parameters, and expectations sorted out, it is then appropriate to design and engineer a specific snow-melting system. Note that the typical system design is driven by the amount of energy needed to overcome the anticipated amount of snow and air temperatures. For planning purposes, this is usually calculated based on the number of BTUs needed on a square-foot basis. For most systems, the typical requirement is 120–170 BTUs per square foot depending on outdoor temperature and system configuration.

Some further design criteria for different system types follows.

Photos courtesy of Watts

Hydronic snow-melting systems rely on the same basic components as other hydronic systems: a boiler, distribution piping and manifolds, zone controls, pumps, and tubing for the radiant snow melting.


 

Supply and return piping needs to be insulated, and pre-insulated products are available for this specific purpose.

Hydronic System Design

The design of a hydronic snow-melting system is similar to other hydronic systems used for other purposes. Keep in mind that hydronic snow-melting systems not using a dedicated heat source will use a heat exchanger at the piping interface. This added component needs to be factored into the mechanical room requirements. The heat transfer medium in the hydronic systems is based on using water and a glycol mix with calculations made accordingly. Other design considerations include the following:

  • Temperature: The water temperature should be designed for 100–150 degrees Fahrenheit. This temperature can be fluctuated in a hydronic system as needed for a particular design depending on the mass of the surface, differing conditions, and the snow-melting time cycle desired (i.e., 4, 5, or 6 hours).
  • Pipe size: It is common to use ½-inch-diameter pipe or larger depending on the length and area of the snow-melting location.
  • Supply/return pipe insulation: The distance between the boiler/heat exchanger and the surface where the snow-melting system is installed will require supply and return transmission piping. All of this piping will need to be insulated to ensure that the heat is applied as intended and not lost along the way.
  • Snow-melting insulation: Placing insulation under a snow-melting system is generally viewed as optional and is not normally used. However, there may be cases where it is necessary based on the application, performance factors, or regulatory requirements.
  • Piping layout: The length of the hydronic piping (or tubing) should be considered in a layout. Typically, longer runs mean more pressure drop, which affects the performance and size of the pumps used to move the water/glycol mix.
  • Piping spacing: The spacing distance between parallel piping tubes is important. The general guideline is to space tubing between 6–12 inches on center, with a 9-inch spacing being most typical. The use of a 6-inch tube spacing is typical for critical use areas, such as a hospital entrance, handicapped ramps, parking garage ramps, etc. Spacing that is wider than 12 inches will tend to cause striping of the snow/ice and not melt the surface area completely, so spacing of more than 12 inches should be avoided.
  • Depth of pipe: The piping/tubing needs to be close enough to the surface to be effective but must remain covered. Therefore, it should be no closer than 2–3 inches from the surface for proper protection. It should also be no deeper than needed since the further down it is, the slower the response rate and the more energy that will be needed to operate the system.

Photos courtesy of Watts

Electrical snow-melting systems can use preassembled mats of wire (left) or hand-installed coils of electrical wire (right). The preassembled mats have the advantage of ensuring a uniform spacing and streamlined installation.

LEARNING OBJECTIVES
  • Identify the primary characteristics of snow-melting systems, including the ways that they help protect building users, owners, and the public.
  • Assess the design and performance considerations of both the buildings and their surroundings on successful snow-melting systems.
  • Recognize the primary parameters for the design of functional hydronic and electric snow-melting systems.
  • Investigate the range of options that are available for the control of snow-melting systems that help ensure the safety and well-being of people using the building or facility.
ALL CREDITS

As an IACET Accredited Provider, BNP Media offers IACET CEUs for its learning events that comply with the ANSI/IACET Continuing Education and Training Standard.

This course is approved as a Structured Course

This course can be self-reported to the AANB, as per their CE Guidelines

Approved for structured learning

This course can be self-reported for Learning Units to the Architectural Institute of British Columbia

Approved for Core Learning

This course can be self-reported to the NLAA

Course may qualify for Learning Hours with NWTAA

Course eligible for OAA Learning Hours

This course is approved as a core course

Originally published in Architectural Record

Subscribe to Architectural Record

Originally published in May 2021