Roof Design Considerations That Prevent Installation Failures and Change Orders  

Design Details That Make or Break Roof Installations

Sponsored by Mule-Hide Products Co. Inc. | Presented by Kyle Stavish

Webinar On-Demand

Course Preview

 

The Sydney Opera house is one of the most iconic roof images in the world. An architectural treasure but a roofing nightmare. Roof designs can be fun! Roofing, not so much. “An Eye on the Details” addresses four common conditions that routinely provide installation issues during construction. 

This course provides visual examples of actual field conditions. Some good, some not so good; along with design suggestions that can cut installation costs and reduce construction change orders. Upon completion of this course, you will have a better understanding of the requirements the roofing contractor must meet to provide the specified roofing system warranty, and long-term value to the owner.

Photo Credit: Haizhan Zheng / iStock / Getty Images Plus / via Getty Images

 

Speaker

Kyle Stavish has been in the building products industry for over 15 years holding multiple roles from sales, training, sales development and management. Spending the last 9 years with MuleHide focusing on increasing brand positioning with design professionals

Originally published in Building Enclosure

Originally published in March 2026

LEARNING OBJECTIVES
  1. Cover the importance of water flow on a roof and how it affects system sustainability, causing seemingly minor issues to manifest into serious performance limitations.
  2. Identify the importance of creating space between rooftop projections and investigate basic design guidelines.
  3. Explore requirements for flashing heights at various conditions often encountered on a roofing system. 
  4. Cover basic roof edge design and the effects of under designing.