Vertical School Expansions

Nowhere to Go but Up: Schools on tight urban sites are raising the roof.
[ Page 2 of 2 ]  previous page Page 1 Page 2
Architectural Record
By Katharine Logan
This test is no longer available for credit

IMAGES: © 2018 FRANCIS DZIKOWSKI/OTTO (LEFT); COURTESY MBB (RIGHT)

A new gym (left), designed by Murphy Burnham & Buttrick for the Grace Church School in Manhattan has a boomerang-shaped roof invisible from the street. A jack slab with springs (right) provides an acoustic break between the gym and the classrooms below.

The structure consists of glulam-timber trusses and cross-laminated timber (CLT) panels generating forms that in section look like “house” shapes that have slipped heavily to one side. The prefabricated system was erected quickly—six weeks for Phase 1—without interrupting the school’s operation. To avoid the need for structural reinforcing of the original precast structure, an ingenious design takes advantage of spare capacity in the interior shear walls, which were built to the same standard as the load-bearing exterior walls. The lightweight addition is configured to transmit its gravity loads at 90 degrees to the gravity loads of the original structure, through those overbuilt shear walls. “How to use the old structure was a challenge at first,” says Hartmann, “but to use it in this clever way is one of the most successful aspects of the project.”

The extension includes an auditorium, a library with access to a roof garden, music rooms, classrooms, administrative offices, and, on the ground floor of a new stair leg, a community-facing coffee shop. Except where acoustic cladding is required, the timber structure is left exposed on the interior, to express the structure’s materiality and to reduce resource consumption. From the project’s completed portion, which has been in use for a year, Hartmann reports that the CLT panels are wearing better than conventional classroom surfaces.

Because the Berlin Metropolitan School is one of many that were built with this kit of parts, the principles of Sauerbruch Hutton’s solution are transferable, and Hartmann is already speaking with another school board about the option.

In New York City, where real-estate pressures are squeezing buildings ever upward, MBB has also built several rooftop extensions for schools, especially in cases of adaptive reuse. Grace Church School, for example, established the high school component of its program about seven years ago in what was originally a mid-19th-century row of dwellings, planning to add a gymnasium in the future on the roof. Recently completed, the school’s 14,000-square-foot extension provides large multipurpose spaces that can accommodate courts for team sports as well as all-school gatherings and events.

An array of long skylights in a new, arched steel roof works with large windows to let daylight into the addition, and a palette that includes exposed steel structural elements, glass, and wood complements the school’s original building. The expansion also adds offices, locker rooms, and storage areas, as well as a new fitness center. Designed for flexibility, the athletic facility doubles as a performance space for theatrical productions; the new space for storage makes for ease of transformation.

Long-span spaces like gymnasiums represent one of the key opportunities of rooftop additions, says Burnham, where a large, open volume can be designed without structural responsibilities for loads above. That doesn’t mean the construction of Grace Church’s athletic center was without structural challenges, though. The historic building that houses the high school program has a single brick facade, but consists structurally of multiple smaller buildings of lightweight construction—wood-frame, with some steel—that were incapable of supporting the load of the new gym. The first phase of construction entailed reinforcing the original structure. New steel members were tied into the existing columns to augment their capacity and carry the new loads to existing foundations. “It was a lot of work,” says Burnham.

PHOTOGRAPHY: © ANTHONY COLEMAN

From the exterior, Cottrell and Vermeulen’s new top floor at Streatham & Clapham Girls School in London appears almost as though it has always been there (right). Its interior looks more like a contemporary addition, with structural elements that include glulam columns that branch and cross, and CLT ceiling panels (left).

The addition also presented sound-transmission issues. To separate the noise of basketballs thumping on the gym floor from conversations in the classrooms below, the athletic facility sits on a jack slab lifted on springs above the original roof level, with a 5-inch air space between the two slabs providing an acoustic break. But solving that problem complicated elevator access. An existing elevator, recalibrated to serve the extra story, couldn’t quite account for the jack slab, so subtle ramps make up the difference. More straightforward is the stair access: a wide existing flight was extended to reach the new floor, with overscaled glazing above to bring daylight deep into the floors below.

Like Vera Hartmann, Burnham says that working a rooftop extension into the fabric of an existing building poses a major design challenge: “Do you make it look as if it has always been there, or do you make it look like a new thing sitting on top of the building?” she says. Ultimately this may not be up to the architect. To win approval from the city’s Landmarks Preservation Commission, which oversees development applications in Grace Church School’s historic district, the boomerang-shaped roof of the new construction conforms to a sight-line-defined envelope that conceals it from street view. The resulting form, says Burnham, “emerges out of the roof as an object. Even though it’s invisible from the street, it creates its own identity, and contributes to the school’s. It’s a wonderful thing to be all in one place at once.”

For an extension to accommodate students in their final two years at London’s Streatham & Clapham High School for girls, Cottrell and Vermeulen took the opposite strategy. “We had the idea that we were completing the building rather than extending it,” says Simon Tucker, a director at the firm. A glassy new fourth-floor pavilion respects and enhances the character of the original 1930s three-story load-bearing masonry structure, and provides what Tucker calls a “thermal cap”: the properly insulated fourth floor, including a green roof, will considerably improve the thermal performance of the otherwise uninsulated building.

Sparing the school’s outdoor space in a fully built-out neighborhood, the vertical extension is the first phase (completed in 2016) of a RIBA Regional Award–winning project that also includes a new street-facing entrance, reception, and dining commons (completed in 2018). The 14,500-square-foot fourth floor provides a spine of classrooms, offices, science lab, and service spaces bookended by a dining and social gathering space and a new library. It operates almost as a school within a school, with most of the final two years’ programming occurring on this level.

Ample daylight and spectacular views toward the City of London, from the social and study spaces in particular, mark them as special points, part of the school’s larger aspiration to provide a sense of balance and uplift to young women going through these critical academic years. “Hopefully, that’s one of the biggest contributions that we’ve made,” says Tucker. “Rather than just giving them a conventional series of educational spaces, this is something that might address the wider issue of well-being.”

Configuring the new spaces in a way similar to floors below allowed the extension to take advantage of surplus structural capacity in the original masonry walls. A lightweight prefabricated system of glulam columns, in shapes that branch and cross, and exposed CLT panels required no upgrade to the base structure. In addition to its light weight, the prefabricated solution helped meet the challenge of building the rooftop addition in a single academic year, with minimal dust and noise while the school continued to operate. The primary structure went up in two to three weeks, with subsequent work conducted under cover and protected from the elements.

Also key to meeting the schedule, says Tucker, was the decision to bring the contractor on board immediately after schematic design to help resolve construction logistics, develop familiarity with the site to facilitate planning, and build relationships with school personnel to smooth the flow of work.

The new fourth floor is reached via two glass-enclosed stair towers, which underwent a major upgrade to serve as fire-fighting stairs for the extra height and to safeguard exiting for an extended time. Improvements included higher-rated doors and screens to achieve a two-hour fire separation, protected lobbies at each level, a new smoke-venting strategy for the staircases, dry risers in each stairwell for fire-hose attachments at every floor, and direct exterior egress at the ground floor. The common room, designed to accommodate more than 60 pupils, required an additional escape stair. “Going higher is a serious issue now,” says Tucker, mentioning London’s Grenfell Tower disaster (which Streatham & Clapham’s rooftop expansion predates). “There needs to be rigorous analysis of what the fire and escape issues are, particularly with schools and the age of the children you’re dealing with.”

As the pressures driving urban schools higher become more widely felt, the key to the success of vertical extensions is care in integrating height into operations. Otherwise, transitions between floors that are farther and farther apart will result in significant time loss in the learning day. “It isn’t useful to build more accommodation on top of a building and expect it just to extend the school’s existing educational model,” says Tucker.

Each of the three profiled schools has programmed its vertical addition to limit the number of times in a day that students will have to make the climb. Streatham & Clapham operates the top floor as a self-contained component. Grace Church School uses its extension for a single program element. Berlin Metropolitan School’s new upper levels accommodate special destination spaces. “If you build up, it has to be the right educational model for that school,” says Tucker. “You have to conceive of the school’s operation as a whole.”

 

[ Page 2 of 2 ]  previous page Page 1 Page 2
Originally published in Architectural Record
Originally published in January 2019


Notice

Academies